English 中文
Our Business
SCOPE OF BUSINESS MAJOR PERFORMANCE INTERNATIONAL CO-OPERATION

CHINA ZHONGYUAN ENGINEERING

SCOPE OF BUSINESS

Nuclear Power Technology

With the complete nuclear industry chain and a series of independently developed G-Ⅲ nuclear power technologies, i.e. Hualong one (HPR1000), ACP600 and SMR (ACP100), we are able to have all-round cooperation with the globe.

Renewable Energy

Focus on the construction of renewable energy projects,featuring solar,wind,tidal and other renewable energies.

Application of Nuclear Technology

Industrial production of isotopes and its products, radiation processing products and services, and radiographic equipment.

Nuclear Fuel Cycle Service

For global users, we provide complete nuclear fuel cycle services ranging from uranium exploration to the reprocessing of spent fuel. We are also the sole Chinese nuclear fuel supplier that can produce various types of fuels for VVER, AFA3G, PHWR, CF3, HTGR, AP1000 and other types of reactors.

Nuclear Scientific Research

More than 20 national research institutes, advanced technology R&D platforms and a competent scientific research team.

Nuclear Power

R&D, design, general contracting, engineering, and operation of nuclear power reactors and provide services to world customers.

Nuclear Environmental Protection

Complete decommissioning of nuclear facilities, reprocessing and disposal of radioactive wastes, transportation system for nuclear materials, radiation protection system and emergency response system, ensuring the safe transportation of spent fuel and disposal of radioactive wastes.

Main Performances of EPC Projects
Algeria Birine Nuclear Research Center (Phase-I and Phase-II)

The center is the first large-sized nuclear facility exported by China with a turnkey mode. Phase-I includes a heavy water reactor and other associated facility, Phase-II consists of nine hot cells for post-irradiation examination on fuel elements and material. The reactor nominal capacity is 15MW and the thermal neutron flux rate is 2.4x1014n/cm2.s. It could be used for basic and application research, and also used for radioisotopes and radiopharmaceuticals production, silicon doping, fuel element and material radiation test, neutron activation analysis, cold neutron research, nuclear instrument scale, etc. Some key techniques were transferred to Algeria and local human resource was developed for reactor operation and maintenance and research work. The project was awarded the first Prize of National Science and Technology Progress, and was credited as a successful example of “south-south cooperation”.

Pakistan Chashma Nuclear Power Plant Unit-1/2/3/4

Pakistan Chashma Nuclear Power Plant Unit-1/2/3/4 witness CZEC’s rich experience of EPC and World-Class management. C1, the first nuclear power plant exported by China and a milestone of China’s nuclear power going abroad, was praised as an “excellent model” by the Pakistani government. C2, another model of Sino-Pakistan cooperation in science and technology, its provisional acceptance was 111 days ahead of schedule. At the moment, C3 and C4 are also going well; the project progress, safety, quality and cost are well controlled.

Pakistan Karachi Nuclear Power Plant II and III(K-2/3)

卡拉奇核电项目(K2、K3)是巴基斯坦国内目前最大的核电项目。卡拉奇2号核电机组是继福建福清5号机组之后全球第二个开建的华龙一号核电项目,意味着华龙一号首次走出国门,正式落地巴基斯坦,海内外将同步推进华龙一号示范堆的建设。2015年,8月20日,卡拉奇核电项目二号机组第一罐混凝土浇筑,标志着项目正式开建。目前,已进入全面建设阶段。

High Technology Research, Development and Utilization
In-Hospital Neutron Irradiator (IHNI)

Prof. Zhou Yongmao, Member of Chinese Academy of Engineering, has developed the framework design of IHNI for maligned cancer treatment by combining boron neutron capture principle with application of miniature reactor, and the original framework design of IHNI project was conferred with patent certificate by China Intellectual Property Rights Bureau. IHNI-1, the first set of In-Hospital Neutron Irradiator in the world to be operated by neurosurgeons specially designed for BNCT malignant tumor treatment, which has been awarded with the First Prize of Science and Technology by China Nuclear Energy Association, was constructed in early 2010. At present stage, Prof. Zhou Yongmao and his team are engaged in development of IHNI-1 updated products.

International Thermonuclear Experimental Reactor (ITER)

International Thermonuclear Experimental Reactor (ITER) Project is an international multi-cooperation big science project after the international space station for developing a Tokamak of self-sustaining combustion and verifying the engineering feasibility and reliability of the thermonuclear reactor. It is the largest international Science and Technology project that China participates as a competent equal partner like other members.CNNC-CZEC has participated in the ITER Program.

Domestic and overseas civil projects

We have undertaken a great number of civil projects both at home and abroad and have made outstanding achievements.

YFJD Technology Complex Building (E-01) Project in Chengdu province undertook by CZEC, is awarded the Lotus Cup for its high quality and a reputation as the civilized construction site as well.

CZEC has conducted many oversea civil projects, such as University and Residential Project in Algeria, Expressway in Malaysia, and Dike-dam in Brunei. These demonstrated our construction and management ability of civil projects.

International Cooperation & Market Development

For more than 30 years, we have consistently provided reliable, economical and high-quality products and services to our oversea customers. While dedicating ourselves to the development of nuclear power industry, we’re also willing to share our achievements and all the benefits that could be brought in to our users.

加拿大项目

2014年7月 中核集团与加拿大SNC兰万灵集团公司签署合作谅解备忘录 2014年11月 中核集团与加拿大坎杜能源公司于APEC期间签署了关于组建合资公司的框架协议 2015年9月 中核集团公司钱智民总经理与兰万灵集团公司高层就双方成立合资公司及相关战略合作举行会谈,并签署AFCR前期研发协议、服务合同和会议纪要。 2016年9月 钱智民总经理与兰万灵公司电力总裁Sandy Taylor、上海电气核电集团李华刚副总裁签署了《中国核工业集团公司与坎杜能源公司、上海电气集团股份有限公司关于成立中外合资经营企业的联合声明》

约旦项目

2015年5月,中国核工业集团公司、约旦原子能委员会、俄罗斯原子能海外公司召开首次三方高层会议。 2015年7月,中国核工业集团公司、约旦原子能委员会、俄罗斯原子能海外公司召开第二次三方高层会议。

沙特项目

2012年1月,中沙两国签署了政府间和平利用核能协定 2013年11月,中核集团与沙特国王科技城(KACST)签署了《关于沙特核能开发项目合作的谅解备忘录》 2013年12月,国家能源局与沙特核能城(K.A.CARE)签署了《加强和平利用核能合作的谅解备忘录》 2014年2月,中核集团与沙特科技发展与投资公司(TAQNIA)签署了《关于沙特核能与可再生能源项目第一次指导委员会会议纪要》 2014年8月,中核集团与K.A.CARE签署了《关于在和平利用核能领域项目合作协调机制的谅解备忘录》 2014年11月,中核集团与TAQNIA签署了《关于沙特核能与可再生能源项目第二次指导委员会会议纪要》 2016年8月,中核集团与K.A.CARE签署了《关于核技术人力资源建设的谅解备忘录》

巴基斯坦项目

恰希玛4台核电机组建设历程 2000年9月,1号机组投入商运。 2011年5月,2号机组投入商运。 2011年3月,3号机组第一罐混凝土浇灌成功。 2013年3月,3号机组穹顶吊装成功。 2016年5月,3号机组首次装料成功。 2016年10月,3号机组首次临界。 2016年10月,3号机组正式并网成功 2011年12月,4号机组第一罐混凝土浇灌成功。 2016年5月,4号机组进入全面调试阶段。 卡拉奇2台核电机组建设历程 2013年2月,中核集团与巴基斯坦原委会于签订了卡拉奇2、3号核电项目华龙一号出口合同。 2015年8月,2号机组实现核岛浇筑第一罐混凝土

巴西项目

2015年5月,中核集团与巴西国家电力公司、巴西核电公司签署了《核能领域合作谅解备忘录》; 2015年5月,参展《中国大型装备制造业展会》 2016年9月,中原公司组织代表团与巴西电力公司签署会议纪要,与巴西电力公司、巴西核电公司签署联合声明

阿根廷压水堆

2015年2月 国家能源局与阿根廷计划部签署了《关于在阿根廷合作建设压水堆核电站的协议》,双方同意采用中核集团“华龙一号”技术 2015年11月 CNNC与NASA签署了《阿根廷压水堆项目框架合同》 2016年6月 阿根廷能矿部部长与国家能源局局长签署《关于合作建设阿根廷核电站的谅解备忘录》 2016年9月 G20期间,CNNC总经理钱智民拜会了阿根廷总统马克里,马克里总统表示将积极支持、推动双方核电合作,实现压水堆项目2019年开工建设

阿根廷重水堆

2014年7月,国家能源局与阿根廷计划部签署了《中华人民共和国政府和阿根廷共和国政府关于在阿根廷合作建设重水堆核电站的协议》;中核集团、中国工商银行与阿根廷核电公司(NASA)签署了《关于建设阿根廷重水堆核电项目的实施协议》; 2014年9月,中核集团与NASA签署了《阿根廷重水堆核电站框架合同》; 2015年2月,国家能源局与阿根廷计划部签署了《关于合作在阿根廷建设重水堆核电站的谅解备忘录》; 2015年11月,中国工商银行与阿根廷经济部签署了《关于阿根廷重水堆核电站的融资条款清单》; 2016年6月,国家能源局努尔•白克力与阿根廷能矿部部长阿朗古伦举行签署了《关于合作建设阿根廷核电站的谅解备忘录》; 2016年9月,G20杭州峰会期间集团公司总经理钱智民拜会阿根廷总统马克里,马克里总统表示将积极支持、推动双方核电合作,实现重水堆项目2017年开工建设、压水堆项目2019年开工建设。

阿尔及利亚项目

1983年2月,中华人民共和国核工业部与阿尔及利亚民主人民共和国新能源署在北京签署关于和平合作利用核能合作议定书。 1987年,中核集团中国中原对外有限公司为阿尔及利亚设计建造以15MW重水研究堆(ES-Salem反应堆)为核心的比林核研究中心。 1993年,比林核研究中心一期工程(重水研究堆及辅助设施)完成最终验收。并于当年国际原子能机构年会上,重水研究堆出口工程项目被IAEA誉为“南南合作的典范”。 1991年至1996年,中原公司为阿方设计建造比林核研究中心二期工程。1996年,中国援助阿尔及利亚的和平堆(MHWRR)获国家科技进步一等奖。 2008年3月,中阿双方重新签署了“中阿两国政府关于和平利用核能合作协议”及“中阿两国关于和平利用核能合作伙伴协议”。 2014年12月,中原公司与比林核研究中心正式签署了比林核研究中心一二期升级改造项目合同。 2015年4月,中核集团与阿尔及利亚原子能署签署了《中国核工业集团公司与阿尔及利亚原子能署核能全面战略合作协议》。该协议旨在推动双方在核电、研究堆、核安全、核技术、核燃料、核安保、海水淡化等领域的务实合作。 2016年9月, 国家能源局局长努尔.白克力与阿尔及利亚能源部部长Noureddine Boutarfa进行会谈,双方就进一步深化中阿核能合作进行了深入的交流。

苏丹项目

2013年7月,中核集团与苏丹水资源与电力部签署了《CNNC与WRE关于核电合作协调机制谅解备忘录》和第一次高层协调会议纪要 2013年7月,中核集团与苏丹水资源与电力部签署了《苏丹第一座核电厂址选择框架协议》和《苏丹核电人力资源框架协议》 2013年11月,国家能源局局长吴新雄与苏丹水资源与电力部副部长Musa共同签署了中苏两国“政府间和平利用核能协议” 2013年11月,中原公司与苏丹水资源与电力部签署了《苏丹核电人力资源培训合同》 2016年5月,孙勤董事长代表中核集团与苏丹水电部部长穆塔兹签署了《厂址初可研和可研技术服务框架协议》和《人力资源开发服务框架协议》

埃及项目

2002年1月,中埃两国政府签署了《和平利用核能协议》 2014年12月, MOEE与中核集团签署《太阳能领域合作谅解备忘录》。 2014年12月,埃及总统塞西访华期间发表了《中华人民共和国和阿拉伯埃及共和国关于建立全面战略伙伴关系的联合声明》,明确了两国加强和平利用核能领域的合作。 2015年5月,中核集团与埃及电力及可再生能源部签署了《中核集团与埃及核电管理局核能合作谅解备忘录》。 2015年7月,中核集团向埃及电力及可再生能源部提交了商务、融资和技术建议书。 2016年1月,习主席访问埃及,全方位推进中埃全面战略伙伴关系深入发展,期间习主席在埃及总理谢里夫·伊斯梅尔的陪同下参加了我国在埃及首都开罗举办的中国高科技展,亲切询问了中核集团的业务情况,并向伊斯梅尔总理介绍华龙一号。 2016年8月,中核集团向埃及电力及可再生能源部提交了进一步融资建议书和商务报价函。 2016年10月,中核集团编制技术转让、本地化和燃料供应与厂建建议书,以及人力资源发展方案。

哈萨克斯坦项目

2010年6月,中哈两国政府签署《中华人民共和国政府与哈萨克斯坦共和国政府和平利用核能合作协定》。2011年4月20日,该协定正式生效。 2011年6月,中核集团与哈原子能工业公司签署核能领域战略合作协议。 2013年12月,中核集团代表团与哈萨克斯坦国家原子能公司签署了《中国核工业集团公司与哈萨克斯坦原子能工业公司关于落实核能领域战略合作协议共同行动的议定书》。
0.0191s